5.30.2007

How the mighty have fallen

Front of House = done

- Steve 5/27/07


Storm: 1
Steve: 0

I guess I shouldn't have opened my big fat mouth.


5.27.2007

Garden work, part II

Front of House = done

Before

After


5.26.2007

Experience CD Project Part II

Hard at work!












































Experience CD Project Part I

This weekend we recorded a CD project with my church, titled "Experience" (not Jimi Hendrix and the..:). We really had a good time with it, I can't wait to hear how it came out!

We recorded in a "live" environment in an amazing church sanctuary at Asbury Methodist Church in Bossier City. It was built within the last year or so and was designed "acoustically correct" with scalloped walls and the like. Very interesting design.
















Setting up the equipment.... always the best part....





















5.21.2007

Garden Fun

May 20.. good time to start work on the yard. 20 bags of mulch, 4 shrubs and a bunch of petunias later.. we are at least done with the right side of the house. Left side of the house is next!











5.14.2007

Epifani

Got this a few weeks ago after I sold my Carvin setup; I have to say I am a fully-fledged Epifani fan now, it really doesnt get much better than this! Also pictured is my Ampeg B1RE head that is soon to be on Ebay.. (being replaced with markbass little mark II). The ampeg only puts about 175W into 8 ohms, and the epifani handles 300w continous. The markbass will put 300w into 8 ohms, so i'll have a little more "room" when i need to bump it up a hair.