1.28.2007

January Bathroom Project

First are the obligatory pre-project pictures. We have a light purple, sort of lavender colored paint on the walls and ceiling, along with some impressive 1980 movie star light fixtures. Why would anyone want to try and improve this?


Now here we are in the middle of the project. I have painted the ceiling at this point, and removed the lovely light fixtures. Notice exposed wires, the universal sign that work is underway. (are those wires hot?). You will also notice the spread of tools all over the counters, as well as the laptop w/speakers for listening pleasure.





Now we are seeing some progress. This is after the painting is done, the fixtures are in, and th e mirrors are framed. Notice the tape holding the framing in place while the adhesive dries, very attractive.




And here we are with the finished product.. first a shot of the trim that I put in (the floors were already done), followed by two shots similar to the pre-project pictures.























No comments: